|
||||
|
Garage | reviews | History Pub | stuff i did | Notes $ | me | my kids | virtual tuning | estafette game | photos | links | forum | Contact |
||||
|
kitchen
the day we visited the house
cement mixer i bought
chicken wired kitchen floor for dial
poured and ready for leveler
smashed out door to liven room
her it is tiled , annes workrn on the pattern between the two floors
still need to do this side
door cut down and tiles almost finished
i knocked down the header on the kitchen side of door , fucken thing was 1.8 meters , i smacked my head all the time , now it's 1.95 meters , here you can see hole in ceilin for heatin vents , the hole i smashed above cupboards to get access at both electricity and plubing , all above the cupboards passes loads of shit i need to redoo ....
here it is almost finished
this is again the mess i found above the cupboards , i was lookin to wire up the garage ( the big black wire i ran to garage ) most of these wires i still haven't found out were they go , gotta find out were they go before i unplug them or rewire them to a new circuite
see i changed all the pipes and could finally line up the power relais box properly
all brand new pipes
all new plumbin , this is whats for the kitchen and outside , just have to move the sink now
not finished this side yet , haven really started the countertops , but the pipin is all done
the other side , the cabinets i'm buyildin , all this will be painted white
three coats of paint here's 2
walls finished , need the two coats more on frames
all the plumbing is now finished here
|
||||
| a |