|
||||
|
Garage | reviews | History Pub | stuff i did | Notes $ | me | my kids | virtual tuning | estafette game | photos | links | forum | Contact |
||||
|
fireplace
reserve for hearth , future fireplace in liven room my wife lost the charger for the camera ... so i only have scans to explain my chiminie , 3 weeks of work to get here...
this is before picture
this is after , walls down and floor redone fire place in testing heatin system , box in cieling , the chimine tube is like the picture but 7 meters tall
the front is surounded in insulation and will be sealed tight when i finish the deco part of the fireplace
theres 7 meters of this i had to run , this is the attic , zoeys room has this but covered in drywall
this is the heat pump in cieling , that starts to pum!p heat from around fireplace and the heat saved in the bricks to rest of house threw flexible insulated tubes i ran all over the house
the outletes in floor for heat from fireplace
the outlets for heat from fireplace in cieling
the system airclimatisation for the summer
the drywall on fireplace will be covered with a wood finish and the bricks you see will be covered in thinly sliced stones that i'll glue to them .... but thats later , i gotta get the roof off now before it startes gettin cold ....
finished finally!
6 stairs of wood , i think thats three cords , 6 meters cubed , we need 8-9 for the winter but have already burneda couple meters cubbed, took me 6 hours to get this from the road out back to here , last year i loaded from the front , it took me and the kids an hour to load it up
|
||||
| a |